{"id":626,"date":"2022-10-03T22:55:00","date_gmt":"2022-10-03T22:55:00","guid":{"rendered":"https:\/\/dev.piu.rs\/?p=626"},"modified":"2024-06-04T22:57:17","modified_gmt":"2024-06-04T22:57:17","slug":"%d0%b7%d0%b0%d0%b2%d1%80%d1%88%d0%b5%d0%bd%d0%b8-%d1%80%d0%b0%d0%b4%d0%be%d0%b2%d0%b8-%d0%bd%d0%b0-%d1%80%d0%b5%d0%ba%d0%be%d0%bd%d1%81%d1%82%d1%80%d1%83%d0%ba%d1%86%d0%b8%d1%98%d0%b8-%d0%be%d1%88","status":"publish","type":"post","link":"https:\/\/piu.rs\/en\/%d0%b7%d0%b0%d0%b2%d1%80%d1%88%d0%b5%d0%bd%d0%b8-%d1%80%d0%b0%d0%b4%d0%be%d0%b2%d0%b8-%d0%bd%d0%b0-%d1%80%d0%b5%d0%ba%d0%be%d0%bd%d1%81%d1%82%d1%80%d1%83%d0%ba%d1%86%d0%b8%d1%98%d0%b8-%d0%be%d1%88\/","title":{"rendered":"Completed works on the reconstruction of the elementary school \"Jovan Jovanovi\u0107 Zmaj\" in Vranje"},"content":{"rendered":"<p>Works on the reconstruction of the Primary School \"Jovan Jovanovi\u0107 Zmaj\" in Vranje, which is part of the School Modernization Program project, have been completed.<\/p>\n\n\n\n<p>The works include the reconstruction of the existing building, i.e. works on the replacement of the roof covering, works on the hall, works on electrical installations, as well as on the suspended ceiling.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"850\" height=\"568\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/566-full-2.jpg\" alt=\"\" class=\"wp-image-631\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-2.jpg 850w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-2-300x200.jpg 300w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-2-768x513.jpg 768w\" sizes=\"auto, (max-width: 850px) 100vw, 850px\" \/><\/figure>\n\n\n\n<p>The value of the works is RSD 15,995,705.00.<\/p>\n\n\n\n<p>The program is financed from the funds of the European Investment Bank loan in the amount of up to 50 percent of the total value of the Project, the remaining 50 percent is financed by the Republic of Serbia, i.e. local self-governments through infrastructure investments.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"850\" height=\"568\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/566-full-3.jpg\" alt=\"\" class=\"wp-image-630\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-3.jpg 850w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-3-300x200.jpg 300w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-3-768x513.jpg 768w\" sizes=\"auto, (max-width: 850px) 100vw, 850px\" \/><\/figure>\n\n\n\n<p>The aim of the project School Modernization Program is to improve the quality of working conditions of students in the territory of the Republic of Serbia. The promoter of the project is the Ministry of Education, Science and Technological Development, while the Publc Sector Projects Implementation Unit Ltd. Belgrade monitored the implementation of this project and performed expert supervision.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"800\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/566-full-5.jpg\" alt=\"\" class=\"wp-image-628\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-5.jpg 600w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-5-225x300.jpg 225w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"850\" height=\"568\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/566-full-6.jpg\" alt=\"\" class=\"wp-image-627\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-6.jpg 850w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-6-300x200.jpg 300w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/566-full-6-768x513.jpg 768w\" sizes=\"auto, (max-width: 850px) 100vw, 850px\" \/><\/figure>\n\n\n\n<p>Photo : Mi\u0161a Stojmenovi\u0107<\/p>","protected":false},"excerpt":{"rendered":"<p>Works on the reconstruction of the Primary School \"Jovan Jovanovi\u0107 Zmaj\" in Vranje, which is part of the School Modernization Program project, have been completed.<\/p>","protected":false},"author":1,"featured_media":629,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-626","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts\/626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/comments?post=626"}],"version-history":[{"count":1,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts\/626\/revisions"}],"predecessor-version":[{"id":632,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts\/626\/revisions\/632"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/media\/629"}],"wp:attachment":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/media?parent=626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/categories?post=626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/tags?post=626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}