{"id":633,"date":"2022-09-19T22:57:00","date_gmt":"2022-09-19T22:57:00","guid":{"rendered":"https:\/\/dev.piu.rs\/?p=633"},"modified":"2024-06-04T22:58:36","modified_gmt":"2024-06-04T22:58:36","slug":"%d0%bf%d0%be%d1%82%d0%bf%d0%b8%d1%81%d0%b0%d0%bd-%d1%83%d0%b3%d0%be%d0%b2%d0%be%d1%80-%d0%be-%d0%b4%d0%be%d0%b4%d0%b5%d0%bb%d0%b8-120-%d0%bf%d0%b0%d0%ba%d0%b5%d1%82%d0%b0-%d0%b3%d1%80%d0%b0%d1%92","status":"publish","type":"post","link":"https:\/\/piu.rs\/en\/%d0%bf%d0%be%d1%82%d0%bf%d0%b8%d1%81%d0%b0%d0%bd-%d1%83%d0%b3%d0%be%d0%b2%d0%be%d1%80-%d0%be-%d0%b4%d0%be%d0%b4%d0%b5%d0%bb%d0%b8-120-%d0%bf%d0%b0%d0%ba%d0%b5%d1%82%d0%b0-%d0%b3%d1%80%d0%b0%d1%92\/","title":{"rendered":"Signed Contract for the Allocation of 120 Packages of Building Materials"},"content":{"rendered":"<p>The contract for the delivery of 120 packages of construction materials was signed by the Acting General Menager of the Public Sector Projects Implementation Unit Ltd. Belgrade, Du\u0161an Kova\u010devi\u0107, and representatives of the selected suppliers: Dragomir \u0160otra, representative of Vanas doo Belgrade, Goran Panti\u0107 on behalf of Savi\u0107 d.o.o. Smederevska Palanka and \u017deljko Jovi\u0107i\u0107, representative of \u0160ekovi\u0107 d.o.o. Obrenovac Zve\u010dka.<\/p>\n\n\n\n<p>The total value of the signed contracts is EUR 1,055,348.23 excluding VAT.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"812\" height=\"801\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/565-full-5.jpg\" alt=\"\" class=\"wp-image-634\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-5.jpg 812w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-5-300x296.jpg 300w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-5-768x758.jpg 768w\" sizes=\"auto, (max-width: 812px) 100vw, 812px\" \/><\/figure>\n\n\n\n<p>The delivery of the building materials package to end users is expected to begin at the end of September.<\/p>\n\n\n\n<p>The allocation of construction material packages is part of the ninth sub-project of the Regional Housing Program, and non-refundable construction material packages will be given to beneficiaries in Ruma, Ba\u010dka Topola and Sremska Mitrovica.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"800\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/565-full-3.jpg\" alt=\"\" class=\"wp-image-636\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-3.jpg 780w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-3-293x300.jpg 293w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-3-768x788.jpg 768w\" sizes=\"auto, (max-width: 780px) 100vw, 780px\" \/><\/figure>\n\n\n\n<p>The aim of the Regional Housing Programme is permanent housing for the most vulnerable refugee families from the former Yugoslavia.<\/p>\n\n\n\n<p>The Regional Housing Programme is implemented with the support of the OSCE, UNHCR and the Council of Europe Development Bank, and is financed by the European Union, which is the largest donor, the United States, Germany, Norway, Switzerland, Italy, Denmark, Turkey, Luxembourg, Spain, Cyprus, the Czech Republic, Hungary, Romania and Slovakia.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"850\" height=\"770\" src=\"https:\/\/dev.piu.rs\/wp-content\/uploads\/2024\/06\/565-full-4.jpg\" alt=\"\" class=\"wp-image-635\" srcset=\"https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-4.jpg 850w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-4-300x272.jpg 300w, https:\/\/piu.rs\/wp-content\/uploads\/2024\/06\/565-full-4-768x696.jpg 768w\" sizes=\"auto, (max-width: 850px) 100vw, 850px\" \/><\/figure>\n\n\n\n<p>The Programme in the Republic of Serbia is managed by the Commissariat for Refugees and Migration in cooperation with the Public Sector Projects Implementation Unit as the implementation unit of the Programme.<\/p>","protected":false},"excerpt":{"rendered":"<p>The contract for the delivery of 120 packages of construction materials was signed by the Acting General Menager of the Public Sector Projects Implementation Unit Ltd. Belgrade, Du\u0161an Kova\u010devi\u0107, and representatives of the selected suppliers: Dragomir \u0160otra, representative of Vanas doo Belgrade, Goran Panti\u0107 on behalf of Savi\u0107 d.o.o. Smederevska Palanka and \u017deljko Jovicic, representative of \u0160ekovi\u0107 d.o.o. Obrenovac Zve\u010dka.<\/p>","protected":false},"author":1,"featured_media":637,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-633","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts\/633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/comments?post=633"}],"version-history":[{"count":1,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts\/633\/revisions"}],"predecessor-version":[{"id":638,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/posts\/633\/revisions\/638"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/media\/637"}],"wp:attachment":[{"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/media?parent=633"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/categories?post=633"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/piu.rs\/en\/wp-json\/wp\/v2\/tags?post=633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}